• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Whitemoor Yard - Cambridgeshire

Status
Not open for further replies.

AndyHA

Member
Joined
1 May 2009
Messages
80
Location
Bishop's Stortford , Hertfordshire
Living whereI live , I note a number of “infrastructure/ civil engineers trains , to and from Whitemoor Yard .

Can any body explain what happens to the used Ballast / Spoil , old sleepers and used Rails etc . That are in the trains that head back to Whitemoor , on a Sunday, or a Monday . Also to a lesser extent early on a week day morning .

There is I believe no “tip” there , so where does it all go to ?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,773
There's an excellent article all about it on the Network Rail site
An old marshalling yard has a new life as a recycling plant that’s helping the railway to save money.
In the Second World War, Whitemoor was an important marshalling yard in the Cambridgeshire countryside, where freight trains would bring, or load up with, goods for distribution. It was so vital for the supply chain that a decoy site, March down yard, was set up locally in case German bombers tried to attack it.

Whitemoor continued as a marshalling yard from the 1920s to the 1980s, but then lay dormant until 2004, when a phased reintroduction of the site began. The marshalling yard reopened, and in 2011 so did a recycling plant, bringing with it a new approach to used railway materials.

It was Network Rail’s National Delivery Service (now Route Services) that took the decision to open this new facility. Previously, various contractors dealt with different recovered materials, but the National Delivery Service realised it could co-ordinate this nationally to get the best value for Network Rail, and Whitemoor was chosen as an ideal site for the facilities required.

Browse the image gallery below.

Marshalling-yard-freight-Whitemoor-Route-Services.jpg

Ballast-train-wagons-Whitemoor-fleet-Route-Services.jpg

Tractor-ballast-pile-Whitemoor-Route-Services.jpg

Ballast-piles-Whitemoor-Route-Services.jpg

Whitemoor-environmental-area-Route-Services.jpg

Marshalling-yard-freight-Whitemoor-Route-Services.jpg

Ballast-train-wagons-Whitemoor-fleet-Route-Services.jpg

Tractor-ballast-pile-Whitemoor-Route-Services.jpg

Ballast-piles-Whitemoor-Route-Services.jpg


High Output Ballast Cleaner Systems. These high-tech machines travel along the railway at night removing dirty, worn ballast and replacing it with clean, more angular pieces. The dirty ballast is taken to a High Output Operations Base, and from here it is delivered to Whitemoor by rail.

Ballast: what is it and why do we clean and replace it?

Watch the video to find out more about the work that goes on at Whitemoor.







afc1ac2ce340524472bde8bbfd67add7b7307fbd.jpg














What happens to recovered rail and sleepers?
High-tech tests are used to grade the rail once it has arrived at Whitemoor, including ultrasonic testing and magnetic particle testing (see the video above). Some of it will be suitable for reuse on mainline track; other rails can be reused for sidings and areas where trains travel at slow speeds. If not crushed for aggregate, concrete sleepers might be cut in half for use on miniature railways.

For all materials recovered by a delivery unit, the Route Services arm of Network Rail credits the delivery unit’s cost centre. This directly benefits the railway in the area where it was collected.

scrap-metal-01.png

Recycling is so important to us, not only as a company but as a country too. To be able to reuse the materials that we receive here in the ways that we do makes me feel incredibly proud to be part of the process. The team at Whitemoor work really hard to create a service that allows us to visibly clear line sides of redundant materials, making it a tidier and safer railway for the public.

Natalie Whitehead, Whitemoor MHD site manager, Network Rail
How is ballast recycled at Whitemoor?
Over time, ballast, the stones beneath the track, becomes worn and dirty, covered in oil and other contaminants. Our High Output Ballast Cleaner System is on the railway every night, filtering through the ballast on the track. The dirty ballast it removes is stored in its wagons and will eventually be taken to Whitemoor.

A common sight at aggregates yards, there is only one ballast washer on the railway – and it’s at Whitemoor. This decontaminates the ballast and is able to clean its own water.

Washing the ballast means we can take it back to a High Output Operations Base for it to eventually be reused on the track. Being able to reuse materials saves money, and means waste doesn’t have to be sent to landfill, which is expensive and not good for the environment. If it’s not possible to reuse it, we sell it, saving money for the railway.



ballast-01.png

How does Whitemoor refurbish switches and crossings?
Switches and crossings (S&C) allow trains to change line and direction and are among the most expensive elements of the track to replace.

The facility for fixing and refurbishing switches and crossings is one of the key functions at Whitemoor. How much refurbishment is needed determines whether S&C are dealt with in situ or brought to Whitemoor.

Ordering the build of a new switch can take a long time. Whitemoor has an array of un-used switches and crossings received from jobs across the country, which the team can use to offer quicker solutions. On occasions they’ve been able to utilise their effective stock levels to refurbish what they have and solve a problem on the network. This takes less time to do than wait for a new one to be made and in effect can reduce the length of speed restrictions out on the network.

One of the bits of kit that’s only available at Whitemoor is a Nencki press, which is used to straighten switch blades and running rail using an integral hydraulic pump. This can manipulate rail horizontally and fits a wide range of rail profiles. It has also been deployed from Whitemoor to other areas of the country when needed.

S&Cs come in a range of standard sizes and designs. However, how they are installed in track and the geometry of S&C layouts is what makes reusing them challenging. When S&Cs come to be replaced, they can be sent to us and we assess their suitability for refurbishment. Very often they can still have a productive life on lower track categories – effectively slower parts of the network. When maintenance teams need to replace S&Cs in the case of sudden failures and potential for train delays, we want to be their first port of call and can often provide solutions far more quickly.

Patrick Nightingale, Whitemoor depot technician, Network Rail
 
Status
Not open for further replies.

Top