I would have like to see 745s run through to Cambridge via Stansted but possibly the single lead Stansted North Junction limits that?
It’s the Stansted tunnel (which can deal with 6tph each way max) and lining up the relevant paths London - Stansted - Cambridge. It would be doable, but st the expense of the Stansted - Norwich’s. Would also need more units of course.