(Not sure what the question was here but...) Glasgow Buchanan Street only had 5 passenger platforms. It had a huge goods yard to the east side of the site.
Had Glasgow North ever been built, then it would've been a 14-platform terminus instead, but we'd have said goodbye to Queen Street High...
Originally, QS High Level had 9 platforms and the Low Level had 4 platforms, however they weren't numbered but lettered A, B, C and D. When the Low Level was electrified in 1960 the 4 platforms were reduced to 2 and presumably this is when they became 10 and 11. The High Level layout was changed...
Ayr has two bays and two through platforms. I *think* the dangerous bit of the hotel is towards the south part of the through lines. Something will have to be done (I've lost track of what's happening with it) and the station will definitely lose a lot of character if, or when, the building is...
Largs.
Used to have 4 platforms, 6 tracks, an overall roof and a number of sidings. Platform 1 was lifted and closed in the 70s and electrification in the 80s reduced the station to 2 tracks. The overall roof was still in place until 1995 when 318 254 decided it wanted to get a look at Largs...
The only request stops I've used are both on the FW - Mallaig line - Lochailort and Loch Eil Outward Bound. Can't help get paranoid that the train won't stop when you're waiting. A button would be very welcome.