• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. D

    Class 701 'Aventra' trains for South Western Railway

    These are fixed formation units, is unlikely that they will ever be remarshalled into a unit with any other number.
  2. D

    Class 701 'Aventra' trains for South Western Railway

    Had my first ride on one of these today - sat in one of the window bays with the mini table. I found it the build out of the window pillars tight on the shoulder - which pushed me into the seat space next to me. Don’t think it would be at all comfortable sitting there with another passenger sat...
  3. D

    Class 701 'Aventra' trains for South Western Railway

    There's no service Staines-Windsor next Monday, Network Rail have a possession on. (On a *normal* Monday!)
  4. D

    Class 701 'Aventra' trains for South Western Railway

    I’m not sure it’s as simple as that - what’s happening right now is that you need a 10-car / 12-car railway on a couple of days of the week and than a 5/8 car railway on some others. There just isn’t the rolling stock to provide an all 10-car service on all services on the Windsor side during...
  5. D

    Another landslip on the SWML (01/12/23)

    Judging by the video posted by @NetworkRailWssx, there is no certainty that they'll be able to complete the reinforcement in the currently planned closures..... Today was about establishing the rate at which they can work! https://x.com/NetworkRailWssx/status/1732461949508575461?s=20
  6. D

    Another landslip on the SWML (01/12/23)

    Passing through the work area and under the (soon to be removed) overbridge today, I couldn't help but notice other areas of banking that are similarly cleared with monitoring in place. There are also some other vegetation issues - trees leaning against wire fences for support and one notable...
  7. D

    Another landslip on the SWML (01/12/23)

    Network Rail Wessex’s Twitter / X says that they are going to chop the whole bridge out overnight.
  8. D

    Another landslip on the SWML (01/12/23)

    I believe 2/89 is a pedestrian overbridge located by Woking Golf Club.
  9. D

    Feltham and Wokingham Resignalling

    They posted something on Twitter about it being on their to-do list, but it is down prioritised due to other (paying) industry work.
  10. D

    SWR Metro fleet permanent withdrawals

    Quite an embarrassing U-turn to be doing this at the last minute. Are things a bit tighter than anticipated in terms of covering the timetable with trains of ?adequate? capacity?
  11. D

    Class 701 'Aventra' trains for South Western Railway

    There has normally been a /5 or two sat around in addition to that - a good bit of Clapham Yard seems to be being given over to these unusable trains.
  12. D

    Revised timetables 20 July

    SWR are doing something really odd on the Windsor side - down services routing via one side of the Hounslow Loop, and Up services returning via the other. Most confusing!
  13. D

    Future of Ticket Office Consultations launched

    Also worth noting that Category 2 stations (and below) will not be able to sell all ticket types, instead encouraging you to buy online or travel to your nearest Category 1 station (with some kind of cost reimbursement for the journey). Doesn’t reimburse the time/effort though. All these staff...
  14. D

    Class 701 'Aventra' trains for South Western Railway

    701014 just went past me leaving Clapham Yard (destination unknown), looked like a bunch of SWR bods in the cab (could see the name badges). Can confirm that the two on the Windsor side of the yard are cut in all the time now (marker lights are a bit pathetic in daytime though!).
  15. D

    SWR taking the Mickey on train lengths

    Delay Repay is just a recipe for frustration most of the time - any excuse they can find to knock a claim back, they will use it. Yes, you can get a token amount back once you satisfy their vexatious requests, however the cost of the time to get each claim complete makes it not worth the while...
  16. D

    SWR taking the Mickey on train lengths

    The Windsor side is a joke some morning/evening peaks now - I’ve been unable to board some services in recent weeks due to there being no physical space on the train. The reduction in services and a move back to 8 carriage trains is a real step back.
  17. D

    Class 450 Door Issues

    A question to the SWR folk - a number of times in the last six months I have had issues with the doors on a 450 starting to open and then closing back to a mid position (with both open and close lights illuminated). Pressing the open button at this point then moves them to fully open. This has...
  18. D

    South Western Railway contract extension

    Based on a very generous definition of “right time” and a timetable that seems to be being slowly adjusted to make every journey longer than it used to be.
  19. D

    SWR Strike Timetables

    Think it’s something to do with the Hounslow route still being run from Feltham box rather than Basingstoke. One less panel to staff.
  20. D

    SWR Strike Timetables

    This limited service at Whitton now means they won’t pay out on Delay Repay for those season ticket holders who still don’t have a service due to needing to travel in the peak. Smart move. Bring back Void Days.

Top