Just returned from 5 days in Blackpool and I have to say the service is useless. Every morning, trams full from around Waterloo Road Northbound.The 25 minute wait Southnound is totally unacceptable, especially on cold wet & windy days (and there were plenty of those last week!). The only improvement seems to be that the timings are now such, that heading South from beyond North Pier, you can now travel fairly safely to North Station and catch the T2. For some reason, on Thursday, most trams had only 1 conductor.
! other complaint, on Tuesday morning, the 10.30 T1, arrived at Starr Gate before the 10.15 T2. Instead of pulling further down to allow the T2 to get through. they went around the depot and arrived at the line next to the fence by the stop, and all of us Fleetwood passengers had to walk up to the gate, and board by climbing from the ground on to the tram, not easy for people like me and my partner with mobility issues and needing a walking stick.
This is a really poor effort from BT. I can't help but feel that the Department of Transport should step in, and tell them to run the improved service, agred when the extension was funded. It really is a disgrace for what is still supposed to be the country's most popular holiday resort.