There are no plans nor have LNWR ever planned a route to Preston, LM did but north of Weaver was ruled out in the franchise bid.
The north bound extension of Crewe services will be to Manchester Airport in May now as long as some extra 350/4s have arrived. The latest plan is an 8 car on the trent with a 4 car splitting at Crewe continuing to the airport.
All the paths are agreed and the extra staff are mostly taken on at Crewe now.
The north bound extension of Crewe services will be to Manchester Airport in May now as long as some extra 350/4s have arrived. The latest plan is an 8 car on the trent with a 4 car splitting at Crewe continuing to the airport.
All the paths are agreed and the extra staff are mostly taken on at Crewe now.