DLR B23 Stock (CAF Inneo)

Snow1964

Established Member
Joined
7 Oct 2019
Messages
8,044
Location
West Wiltshire
Where are the new trains? They don't appear to be in the UK. And has production now been completed? If so it's always an issue getting commissioning issues attended to if the production line team has been dispersed. If nothing else, there's the risk of them running out of warranty before they are first used.
Only about 3 or 4 have been delivered

5 weeks ago TfL Board papers said 40 trains were built, most are being stored by CAF in Spain at TfLs request. So maybe 42-43 now built.

The additional sidings at Becton had been delayed because the building contractor went bust, although another company had since been appointed to finish them. I am guessing once these sidings are commissioned then the trains will resume being delivered. From memory they come in sections on long road trailers on the ferry from Spain (to Portsmouth or Plymouth ?). So will probably take weeks round trip for the special transport vehicles to collect one and deliver to London.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Taunton

Established Member
Joined
1 Aug 2013
Messages
11,068
The additional sidings at Becton had been delayed because the building contractor went bust, although another company had since been appointed to finish them. I
Contractor Buckingham went under two years ago. Another mainstream contractor, Balfour Beatty, then got the work, to finish them, and did so last year. It's only open air sidings, for goodness sake. The main depot buildings etc expansion, needed to lift a whole new full-length train all at once, has always been with another contractor, Morgan Sindall. Buckingham had just got the easy bit outside.
 
Joined
2 Jun 2023
Messages
746
Location
Richmond
Contractor Buckingham went under two years ago. Another mainstream contractor, Balfour Beatty, then got the work, to finish them, and did so last year. It's only open air sidings, for goodness sake. The main depot buildings etc expansion, needed to lift a whole new full-length train all at once, has always been with another contractor, Morgan Sindall. Buckingham had just got the easy bit outside.
So do we know how the main depot building is going then? Must have been delays to that too.
 

Kay_M

Member
Joined
18 Apr 2019
Messages
175
I genuinely hope this isn't going to be like the 358 bus route saga all over again.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
3,787
Location
SW London
I was about to write the same. Nothing seems to be going right in recent years regarding fleet introductions.
Indeed - if Nigel Gresley had had the same problems the "Silver Jubilee" wouldn't have been in service until George V - in whose honour it was named - had been dead for five years (and probably not at all, given contemporary world events, and the fact that Gresley himself had died by then)
 