swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 32,778
Yours is the first mention. First‘s own PR only states ‘at seat catering’...So where is the proposed buffet going?
Yours is the first mention. First‘s own PR only states ‘at seat catering’...So where is the proposed buffet going?
I had seen somewhere they would have a buffet which of course is a dirty word to First. It does state on Wikipedia on board buffets but looking at it again that can't count as reliable I suppose.Yours is the first mention. First‘s own PR only states ‘at seat catering’...
If it's a dirty word, why would they provide one?I had seen somewhere they would have a small buffet which of course is a dirty word to First.
I had seen somewhere they would have a small buffet which of course is a dirty word to First.
If you used first you would know why. They never have them normally.If it's a dirty word, why would they provide one?
Id suggest that the business case wont be set towards encouraging Scotland to Morpeth tickets which take up a possible Edinburgh to London seat and that the costs of any extension would outlay. Personally if I was running it I wouldnt even accept National Rail tickets if I didnt have to.Bit of a random thought, but would there have been much of a case to run the service beyond Edinburgh on to Glasgow Queen St? Say calling at Edinburgh Park, Falkirk High and Lenzie? It would create new links between those stations as well as giving Glasgow a much quicker service on to the East Coast? Whilst the existing change at Waverley isn’t a massive issue, creating new through journeys could attract more passengers. I’d personally use it at least twice a week between Lenzie and Morpeth, a journey that usually involves 2-3 changes
Bit of a random thought, but would there have been much of a case to run the service beyond Edinburgh on to Glasgow Queen St? Say calling at Edinburgh Park, Falkirk High and Lenzie? It would create new links between those stations as well as giving Glasgow a much quicker service on to the East Coast? Whilst the existing change at Waverley isn’t a massive issue, creating new through journeys could attract more passengers. I’d personally use it at least twice a week between Lenzie and Morpeth, a journey that usually involves 2-3 changes
You'd probably need at least one extra set to maintain the London frequency, and have to take over a Scotrail Express path. And though the two-hourly frequency between the East Coast and Glasgow could do with being doubled, it's not nearly as big a market as that to Edinburgh. Either way it's unlikely to be something ECTL have a good commercial justification for doing, let alone something which the ORR would approve.Bit of a random thought, but would there have been much of a case to run the service beyond Edinburgh on to Glasgow Queen St? Say calling at Edinburgh Park, Falkirk High and Lenzie? It would create new links between those stations as well as giving Glasgow a much quicker service on to the East Coast? Whilst the existing change at Waverley isn’t a massive issue, creating new through journeys could attract more passengers. I’d personally use it at least twice a week between Lenzie and Morpeth, a journey that usually involves 2-3 changes
A bold move, especially during the likes of Edinburgh military tattoo, fringe, and Hogmanay plus the numerous events held in London that attract visitors which required massive duplications of coaches to meet demand and LNER and Avante will find they have full and standing trains and Ryanair and easyJet flights booked out months in advance and unable to meet demand. Will 5 cars be enough? Only time will tell but marketed right this could be a rail industry beneficial game changer which LNER will also benefit from
On surge demand dates I suspect they'd be able to run at least some 10 car trains.
If we assume each set can do 3 single trips, and there are 5 each way that gives utilisation of 66% on a 5 unit fleet, so if heavy maintenance were planned taking account of these days, and potentially a hire in of one of Hull Train's sets then 2x 10 car formations running on any given day isn't implausible imo.
Of course not all diagrams will be typical 18+ hour diagrams, which probably makes up for the otherwise rather tight utilisation.I can’t remeber the detail, but some diagrams can only do 2 single trips a day. Think they need four in service every day.
Shame no one at DfT thought about this, oogh 7/8 years ago!fleet of 5 only really works when you have very reliable trains; you would have fewer 'wasted' units if all the 80x were one common, operator-agnostic fleet and Hitachi could provide any serviceable unit. Sadly 'tis not to be!
I don't think it would have worked even in BR days, when the HST was a standard train. Separate fleets were maintained for all the routes they were used on.Shame no one at DfT thought about this, oogh 7/8 years ago!
Yes but you didn't have separate subfleets within each route!I don't think it would have worked even in BR days, when the HST was a standard train. Separate fleets were maintained for all the routes they were used on.
I don't think this universal fleet idea would work necessarily, as the current fleets are tailored specifically to the routes they operate.
I think given the variety of service the different 800, 801 and 802 fleets are needed as they have different strengths/weaknesses. The 803s are technically unique amongst the IEPs currently but there's no reason why a swap with an 801 for whatever reason wouldn't work if it were ever needed.I think that may have been the idea with the initial GWR sets, given things like the basic interior, but we know how well that went.
Is there a confirmed timetable and where can it be found?
Is there a confirmed timetable and where can it be found?
From may onwards i believe
Thanks a lot. I’ll be interested to see them and how close to a peak time service they can get.Paths are in the May timetable, and will be public in a few weeks. However the service won’t be starting until much later in the year,
Thanks a lot. I’ll be interested to see them and how close to a peak time service they can get.
I believe they were avoiding peak time departures from Kings Cross
Yes - might there be a possibility of a pre-1030 arrival?As I said upthread, I’ll be interested to see the journey times. Pathing them can not have been easy.
Yes - might there be a possibility of a pre-1030 arrival?
Unlikely I’d say. That implies a departure around 0600 and a good path.