Topological
Established Member
The HD02 displays might be a candidate for the lies thread though. As we waited for a platform at Shrewsbury it was attributing the delay to "this train being late from the depot", which seemed odd as it had been on time to that point.It's booked a unit so it will just show what is on the full diagram, it's part of a 197 disgram.
It won't change until later if and when HD03 gets allocated to that half of the diagram.
To be fair, HD02 has been a good performer since it's big exam. I've not come across any real faults with it since.
Having seen the loading, it is good that they do use 5 carriages on that train. I cannot imagine how a 3-car would have coped. It is a nice one to use north though, very quiet until Shrewsbury.