Conductor Rail Package
Network Rail will appoint up to 4 Suppliers to a framework. The Supplier shall provide Conductor Rail in lengths of either 18.288m or 91.44m. The minimum manufacturing batch call-off is 1,000 tonnes. The Supplier shall manufacture the batch within 90 calendar days of Network Rail request. The batch will be utilised solely to fulfil Network Rail’s requirements. Following manufacture, and until consumption of the batch, the minimum order quantity shall be 1 rail. The Supplier shall deliver Network Rail’s 18.288m requirements within a 7 calendar day lead time. The Supplier shall deliver Network Rail’s 91.44m requirements within a 30 calendar day lead time. The Supplier shall hold the batch at its own expense and risk, for a maximum of 12 months.