Halifaxlad
Established Member
I was on a service yesterday during the even peak and the service was rammed leaving Leeds. As Ive noticed previously once past Halifax loadings seem reasonable but between Halifax and Leeds via Bradford are bloody terrible.
Is there enough capacity to create another service turning back at Halifax ? I know it will likely depend on the leeds end a lot more than the Bradford end. Even if another platform was needed at Bradford I can't see it being too hard to create another platform adjacent to the disused run round loop through what are little used car parking spaces.
Is there enough capacity to create another service turning back at Halifax ? I know it will likely depend on the leeds end a lot more than the Bradford end. Even if another platform was needed at Bradford I can't see it being too hard to create another platform adjacent to the disused run round loop through what are little used car parking spaces.