Yes, good point there!
For anyone out and about on the Ecml during the week, 800103 is often out on test trains, this has the full new lner spec seats fitted, ie Red in standard and Ox Blood in 1st class
Not seen any pictures published other than one that the marketing manager tweeted.
I have seen the seats in the factory at Aycliffe, and they feel different to the grey seats. Unable to sit on them, so can't compare the firmness.
I think LNER's official position on this is currently "not planned". Bear in mind 140mph running was intended even when the 91s were first introduced 30 years ago. It never happened for the reasons jimm listed. The only mention that I recall of 140mph running for the Azuma fleet was Branson's PR exercise in 2016. Apart from that nobody seemed to say a word, which should be all you need to know. The only way I see the ECML being upgraded to 140 (I believe the AT300 design is actually 240km/h capable by the way, which is almost 150) is if the upper half or all of HS2 is cancelled.Hello there. I've seen comments about potential 140mph running but does anyone know when the Azumas will be allowed to reach that speed?
Hello there. I've seen comments about potential 140mph running but does anyone know when the Azumas will be allowed to reach that speed?
I believe that there was some talk about the speed on the section north of York as far as Darlington being lifted to 140MPH in connection with Transpennine Express to enable more trains to be fed through the section. It would need ETCS and fencing to allow this though.Hello there. I've seen comments about potential 140mph running but does anyone know when the Azumas will be allowed to reach that speed?
Apologies, I didn’t know there was a technical definition of what is classed as moquette. When I was referring to moquette I was referring to a seat covering with some amount of pile as opposed to other material which are pretty much flat. I have tried the GWR 802 seats and they’re bareable for me for an hour or two before substantial shuffling kicks in. It appears at least the LNER ones have some sort of pile no matter how minimal it maybe.You seem to be bit behind when it comes to GWR seat covers. All the Class 802s are being delivered by Hitachi with the moquette seat covers fitted and a start has also been made on providing them in 800s.
That's a possibility and I do think there is some merit in doing that but there will also be 125mph Grand Central 180s to consider, though admittedly very infrequent. I am assuming the ECT units, when eventually ordered, will just be another subclass of 802s, so could presumably also be uprated to 140mph if required.I believe that there was some talk about the speed on the section north of York as far as Darlington being lifted to 140MPH in connection with Transpennine Express to enable more trains to be fed through the section. It would need ETCS and fencing to allow this though.
GWR use cut pile moquette which is lower quality than loop pile moquette. The last (Virgin) refresh on the East Coast used loop pile - I would not be surprised if LNER used the higher quality.The GWR moquette does have 'some amount of pile', as opposed to the flat cloth of the initial covers fitted to the 800s. I doubt that the LNER moquette will be that different in feel to the GWR type, frankly. There's only so much that can be done.
Yeah I'm expecting the LNER unit seats to feel identical to those on the GWR 802s. I haven't yet tried them so the jury is still out - I don't mind somewhat firm and upright seats but didn't get on with the 800/0 seats, so I'm keen to see whether I can feel much of an improvement.
We're heading in the seat direction again!
That's a possibility and I do think there is some merit in doing that but there will also be 125mph Grand Central 180s to consider, though admittedly very infrequent. I am assuming the ECT units, when eventually ordered, will just be another subclass of 802s, so could presumably also be uprated to 140mph if required.
London North Eastern Railway Class 800 on driver training runs
I noticed that 800107 had a full livery and red seats and 800112 was partly done and had black seats is there a reason for this?
Please have a look at the video!
Still running on diesel I see, no solution to the interference issues yet?
800103 and 800107 have the red seats.
All the 800/1s were built with standard grey spec or no seat back fitted, as at the tine it hadn't been finalised what lner wanted.
train's now being assembled at Aycliffe, starting with 801104 have the red seats fitted.
I noticed its running in reverse formation - something that's increased since the GWR 80x trains entered service.
I'm sure LNER will make sure the Azumas face the right way as I bet they'll be complaints from passengers once / if they notice it often enough. The odd 1 reverse formation is fine (2 you can allow), unless there's an emergency where its a case of either very heavy delays or run it the wrong way round on time / less delayed.
Are LNER still planning to go ahead with the proposed London Kings Cross to Huddersfield service that VTEC promised when the Class 800s were launched? Wouldn't these use the 5 car Class 800's as surely Huddersfield's platform 1 and 4 can't take anything longer than 8 coaches, especially given that the 800/801 coaches are longer than the average 185.
Today's test was 7Testing underway last week, this week and for next 2 weeks, involving 4 IEPs running in convoy testing signalling and other systems.
https://twitter.com/DavidHorne/status/1090520336033042434David Horne said:Thank you to the team of people from Hitachi, Network Rail, GBRF, LNER, Volker Rail and others who have been working together overnight, simulating the future by testing seven Azuma trains in the same area at the same time to replicate full service conditions. Great teamwork!
Platform 4 seems to be the most likely option, it would require services terminating there though to use Platforms 5 & 6 instead. Platforms 1 & 8 have a constant flow of TPE services passing through so there's no way they can use those platforms.If the service comes in and leaves to the east (towards wakefield/Leeds) then the only real option is Huddersfield Platform 4. Platform 4 is pretty long.
To use platform 1 and 8 would require empty stock to come/leave via Manchester. Or a reversal at somewhere like Marsden. Or some shunting around Huddesfield.
Which David Horne quickly denied:Today's RAIL magazine has the week beginning April 15th as the target date for Azumas to enter passenger traffic...
(...) However, no date for entry has been set, despite what RAIL magazine says. We'll set a date once the testing has been completed satisfactorily.
Which David Horne quickly denied:
Some interesting pics courtesy of @GarethDennis retweeeted by LNER on Twitter.
https://twitter.com/GarethDennis/status/1093188896010186752
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()