Seen absolutely no sign of testing, or of the sides to the Iron bridge to the West of Hindley being put back into service. An earlier thread suggested that they will run an electrified service from December 2026!
Why is this all taking so long?
Meanwhile, the 769s have had another day of failures, resulting on shortfalls in most trains on the line as 4 car trains are split to provide a shadow of a service that really is unacceptable.
Train information at Hindley all day on 05/03/2025. From Realtime Trains, an independent source of train running info for Great Britain.