1990? If you mean final closure, because I have a feeling that one bit (a press for springs or brake blocks?) remained after the rest closed.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D6130

Established Member
Joined
12 Jan 2021
Messages
7,207
Location
West Yorkshire/Tuscany
I think it was much later. Early 80s.
I'll have a guess at 1983.
Your guess is correct. It closed as an overhaul facility then....although, as @Gloster says, the foundry and spring shop continued - with a much-reduced workforce - until 1995. Perhaps we should have a tie-breaker between the two of you?....although it was the closure of the main overhaul workshops that I had in mind.
 

Gloster

Established Member
Joined
4 Sep 2020
Messages
10,607
Location
Up the creek
Your guess is correct. It closed as an overhaul facility then....although, as @Gloster says, the foundry and spring shop continued - with a much-reduced workforce - until 1995. Perhaps we should have a tie-breaker between the two of you?....although it was the closure of the main overhaul workshops that I had in mind.

No, I will pass the honour to @Peterthegreat .
 