The bit I don't get is spending so much money on an extension to the Cardiff Bay line that doesn't provide a station nearer to Cardiff Bay? The Pierhead St Station seems to be just as far away from the waterfront by The Senedd, and still the wrong side of the busy roads - what am I missing?
The transport interchange at Pierhead St has the arena in mind with its location. To be fair, it's not much of a walk to the waterfront, can't be more than a few minutes.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
13 Feb 2011
Messages
1,063
Location
Cardiff
The bit I don't get is spending so much money on an extension to the Cardiff Bay line that doesn't provide a station nearer to Cardiff Bay? The Pierhead St Station seems to be just as far away from the waterfront by The Senedd, and still the wrong side of the busy roads - what am I missing?
Do you want a station by the bay itself (i.e. the waterfront) or a station near where people live, work and visit?

Both the redevelopment of the existing station site and the new station on/next to Pierhead Street will be big improvements for visitors and residents alike. Pierhead St will presumably allow for some kind of queuing system for those leaving the new arena to board the trains and hopefully this is phase one of a south/eastern Cardiff leg of the line.
 
Last edited:

TheSeeker

Member
Joined
15 Feb 2016
Messages
314
Location
Braine-l'Alleud
The alignment from Cardiff Bay station to the new Pierhead seems to be down Docks Lane. Was that the previous route? How will they get through that big building on the corner of Bute Street and Hemingway Road?
 

mrmartin

Member
Joined
17 Dec 2012
Messages
1,016
Really there is a lot of poorly used space around the Bay, very 80s/90s thinking with huge underused roads and loads of car parks.

Does anyone know if there are proposals to develop Roath docks into apartments etc? I can't find much on it.
 
Joined
22 Jun 2013
Messages
389
Really there is a lot of poorly used space around the Bay, very 80s/90s thinking with huge underused roads and loads of car parks.

Does anyone know if there are proposals to develop Roath docks into apartments etc? I can't find much on it.
Never seen any plans for Roath Dock, still part of the Port of Cardiff as far as I know. Roach Basin has not yet been developed properly, a few failed schemes for housing etc, not sure what the plan is currently.

Maybe a Metro station will create some interest from developers again.
 

mrmartin

Member
Joined
17 Dec 2012
Messages
1,016
Never seen any plans for Roath Dock, still part of the Port of Cardiff as far as I know. Roach Basin has not yet been developed properly, a few failed schemes for housing etc, not sure what the plan is currently.

Maybe a Metro station will create some interest from developers again.
This is sort of the problem with the extensions really, nearly all of the routes they are propsing is either vacant or unused, or at best industrial which doesn't really lend itself well to public transport use as most of the people working there will be out and about in vans.

I suppose it could be built now and hope developers want to redevelop it later but seems awfully speculative to chose a route on that basis.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
2,478
This is sort of the problem with the extensions really, nearly all of the routes they are propsing is either vacant or unused, or at best industrial which doesn't really lend itself well to public transport use as most of the people working there will be out and about in vans.

I suppose it could be built now and hope developers want to redevelop it later but seems awfully speculative to chose a route on that basis.
The master plan is to get from the present Cardiff Bay station to the lines serving the Tremorfa steel mill and hence link with the freight line through the residential area of Splott.
 
Joined
22 Jun 2013
Messages
389
£2.7m from the UK government to start the process of adding 5 new stations on the SWML between Cardiff & STJ. Includes Cardiff Parkway which has already been given permission and is currently stuck with the Welsh Government awaiting approval.

Will add a lot of areas to the Metro which currently have no rail provision, if they all come to fruition.

Link to article
 

Richard Scott

Established Member
Joined
13 Dec 2018
Messages
3,696
£2.7m from the UK government to start the process of adding 5 new stations on the SWML between Cardiff & STJ. Includes Cardiff Parkway which has already been given permission and is currently stuck with the Welsh Government awaiting approval.

Will add a lot of areas to the Metro which currently have no rail provision, if they all come to fruition.

Link to article
Apart from Cardiff Parkway, where are the others? Is Magor included in those?
 
Joined
13 Feb 2011
Messages
1,063
Location
Cardiff
West to East...

Newport Road
Cardiff Parkway
Newport West
(Newport to become Newport Central)
Newport East
Llanwen
Magor

Map and a few details here (no precise locations though).

Newport Road is proposed to be at the junction of Newport Road and Rover Way
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,498
Location
Between Peterborough & Bedlington
West to East...

Newport Road
Cardiff Parkway
Newport West
(Newport to become Newport Central)
Newport East
Llanwen
Magor

Map and a few details here (no precise locations though).

Newport Road is proposed to be at the junction of Newport Road and Rover Way
Of those, I can make a pretty educated guess as to where Magor will be; the area where the station once was is easily visible on Google Maps. TfW could probably get away with platforms on the Relief lines only (in this case, the outer 2 tracks).
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,353
Of those, I can make a pretty educated guess as to where Magor will be; the area where the station once was is easily visible on Google Maps. TfW could probably get away with platforms on the Relief lines only (in this case, the outer 2 tracks).
The locals have been campaigning for a station in Magor for some time. Their website is
 

StKeverne1497

Member
Joined
9 Oct 2019
Messages
140
Location
Caerphilly
The alignment from Cardiff Bay station to the new Pierhead seems to be down Docks Lane. Was that the previous route? How will they get through that big building on the corner of Bute Street and Hemingway Road?
large
large

Apologies if people have seen these before, but they show reasonably clearly what the "previous route" was - well, back in the 1950s or so, anyway! Five tracks to the Bay Station, and a route beyond to the Oval Basin (now Roald Dahl Plass).

From the collections at the National Museum of Wales - if you click on the link and search for "tempest" you will get a list which includes the above images (and many more), and if you search for "soames" you will get others. Check the rights before republishing (note that I've embedded links to the images above rather than attaching them as images).

M.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,498
Location
Between Peterborough & Bedlington
Couple photos from Flickr:
  1. Pontypridd Junction - new masts going up for switching purposes between the footbridge over the line and the 2 viaducts. https://flic.kr/p/2oe2WR8
  2. Quakers Yard - new platform work ongoing. https://flic.kr/p/2oe33D5
  3. Quakers Yard - new footbridge in. https://flic.kr/p/2oe35pQ

And from LinkedIn:
The beams have gone in at Gelynis Farm O/B.
 
Last edited:

MikePJ

Member
Joined
10 Dec 2015
Messages
450
I cycled through Cardiff Bay station area for the first time in a week or so, and there’s a lot more happening: a big site hoarding has gone up between the station and Lloyd George Ave and Hemingway Road. There are also lane closures on Lloyd George Avenue, and signs of some preparatory work for the on-street extension to Pierhead St (note the orange minidigger parked by the Red Dragon Centre). Lots of TfW signage making it clear who is responsible.

Extra pics added later:

The orange digger has dug a trench in this lane of Lloyd George Ave as it approaches The Flourish. My guess is that this is for utilities diversions.

More utilities diversions in Bute Place, behind the Millennium Centre.
 

Attachments

  • A29D1AEA-E314-4209-AE4D-5705E13C248D.jpeg
    A29D1AEA-E314-4209-AE4D-5705E13C248D.jpeg
    2.9 MB · Views: 151
  • EF3E605F-1AD6-479B-BE09-19CD4A294490.jpeg
    EF3E605F-1AD6-479B-BE09-19CD4A294490.jpeg
    4.8 MB · Views: 144
  • AEF12CF8-3233-4F37-99FD-A28B059FC3EC.jpeg
    AEF12CF8-3233-4F37-99FD-A28B059FC3EC.jpeg
    4.4 MB · Views: 143
  • 3860035A-4720-47E9-8683-FA7559F28672.jpeg
    3860035A-4720-47E9-8683-FA7559F28672.jpeg
    4.5 MB · Views: 137
  • A14AD540-B5D4-465C-B2A3-13B680148A29.jpeg
    A14AD540-B5D4-465C-B2A3-13B680148A29.jpeg
    3.7 MB · Views: 135
  • 25184A36-8556-4E11-AC5F-7ADAF4EE6B3A.jpeg
    25184A36-8556-4E11-AC5F-7ADAF4EE6B3A.jpeg
    5.8 MB · Views: 142
  • 30DA2EB2-6932-489F-BDE0-3AAC06549ED1.jpeg
    30DA2EB2-6932-489F-BDE0-3AAC06549ED1.jpeg
    4.5 MB · Views: 144
  • A61EBCC6-8E2D-4349-9EF9-EA51EB993FDE.jpeg
    A61EBCC6-8E2D-4349-9EF9-EA51EB993FDE.jpeg
    3.4 MB · Views: 139
  • B194C258-4E77-4AF8-AB17-EF4B67C7E170.jpeg
    B194C258-4E77-4AF8-AB17-EF4B67C7E170.jpeg
    2.4 MB · Views: 142
  • 7B13E9F3-8217-4429-822B-E6616B9841D8.jpeg
    7B13E9F3-8217-4429-822B-E6616B9841D8.jpeg
    3.3 MB · Views: 128
  • 317E9067-C933-4BD5-9FF0-2BB1FA516AD5.jpeg
    317E9067-C933-4BD5-9FF0-2BB1FA516AD5.jpeg
    3.2 MB · Views: 153
Last edited:

Envoy

Established Member
Joined
29 Aug 2014
Messages
2,478
So, it looks like they are pressing ahead by going on-street from the present Bay station towards the WMC & Senedd. This area can get pretty jammed up with traffic. Why could they simply not have gone straight across Lloyd George Avenue and then through what is now the soon to be demolished entertainments complex whilst still leaving enough space for the proposed arena? I also think it is regrettable that they built to new Premier Inn when knowing that they wanted to take the Metro through this area could have gone on the derelict land and avoided some street running?

My Image below shows groundwork for the Metro track by the WMC with the new Premier Inn on the left.
 

Attachments

  • METRO WORKS - BUTE PLACE  & WMC .jpeg
    METRO WORKS - BUTE PLACE & WMC .jpeg
    474.4 KB · Views: 146

MikePJ

Member
Joined
10 Dec 2015
Messages
450
So, it looks like they are pressing ahead by going on-street from the present Bay station towards the WMC & Senedd. This area can get pretty jammed up with traffic. Why could they simply not have gone straight across Lloyd George Avenue and then through what is now the soon to be demolished entertainments complex whilst still leaving enough space for the proposed arena? I also think it is regrettable that they built to new Premier Inn when knowing that they wanted to take the Metro through this area could have gone on the derelict land and avoided some street running?

My Image below shows groundwork for the Metro track by the WMC with the new Premier Inn on the left.
I strongly suspect that roads will be closed to cars where they are used for tram track. I wouldn't take the current groundworks as a guide to the exact route that the track will take, as it's extremely likely that the trenches are being dug to move pipes and cables out of the way before the track is laid, and it makes a lot more sense for those utilities to end up in a traffic lane rather than directly beneath the tram track in case they need to be accessed again for modifications or maintenance. The sketch map provided as part of the recent consultation (sadly now closed and I didn't save a copy of it at the time... d'oh!) suggested that the trams will not continue down Bute Place where the trenches currently are, but instead squeeze through the rough ground adjacent to the road tunnel portal and the multi-storey car park. I've attempted a crude sketch here based on OpenStreetMap.

I suspect that Bute Place will be converted to single carriageway, and quite possibly the southern end of Lloyd George Ave / The Flourish too. That'll remove a lot of conflict between cars and rail vehicles.

EDIT: one other thing - the speed with which this work has begun leads me to think that some of it is utilities diversions that were already planned when the Metro proposal involved a short extension to the Flourish, as funding for the Pierhead St extension has only literally just been confirmed and so they can't have had time to do any design works for it yet! It's quite possible that the eventual route will change to take advantage of the demolition of the Red Dragon Centre, but that someone at TfW decided that it was worth doing the planned utilities works anyway.

1676475027158.png
 

Cathays147

Member
Joined
2 Jan 2023
Messages
5
Location
Cardiff
Hey sorry if this seems like a silly question/the info can be found in the thread but is there any plans for the Pierhead station in light of the proposed extension?
And would anyone be able to summarise the proposed new stations in Cardiff and potential opening dates, I’ve been trying to keep up but feel I have missed some/some appear to be mothballed
 

MikePJ

Member
Joined
10 Dec 2015
Messages
450
Hey sorry if this seems like a silly question/the info can be found in the thread but is there any plans for the Pierhead station in light of the proposed extension?
And would anyone be able to summarise the proposed new stations in Cardiff and potential opening dates, I’ve been trying to keep up but feel I have missed some/some appear to be mothballed
Here's what I know off-hand:

- Pierhead Street is intended to serve the Millennium Centre and the new arena on the Red Dragon Centre site. It's going to be on the patch of undeveloped land between the Premier Inn and Caspian Point. Beyond that, I've seen no sketches or anything.
- Butetown station (the final name will be chosen later - this is a "working title") is going to be on the Bay branch line, adjacent to Lloyd George Avenue and roughly level with where Maria St and Vellacott Close are. (EDIT - works on this are starting soon, initial ground surveys have been done)
- Gabalfa station is almost certainly happening but I'm not sure exactly where it'll be yet
- Crwys Road station is definitely happening but no works have started on the ground yet

All the others (Ely Mill, another station in the Heath/Roath area, all the various new stations on the main line proposed in the Burns Report) are not as yet formally proposed and funded. But I'm happy to be corrected if other people know better.

So, it looks like they are pressing ahead by going on-street from the present Bay station towards the WMC & Senedd. This area can get pretty jammed up with traffic. Why could they simply not have gone straight across Lloyd George Avenue and then through what is now the soon to be demolished entertainments complex whilst still leaving enough space for the proposed arena? I also think it is regrettable that they built to new Premier Inn when knowing that they wanted to take the Metro through this area could have gone on the derelict land and avoided some street running?

My Image below shows groundwork for the Metro track by the WMC with the new Premier Inn on the left.
I cycled through Cardiff Bay again this evening and the construction work on The Flourish and Bute Terrace turns out to be... district heating. There are large-bore insulated pipes being laid, so it's probably unrelated to TfW's works. Here's a press release - the heat will come from the massive Viridor incinerator plant and the heat will be used to serve the Senedd.
 
Last edited:
Joined
22 Jun 2013
Messages
389
Any extension work past Cardiff Bay station would need detailed plans and planning permission. The current planning consent ends at the current station.

I'd hope to see the next stage progress quicker than the current project, which is a year or decades behind, depending on your view of it. The Cardiff Council leader, Huw Thomas, has said it will proceed "at pace". At what pace remains to be seen.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
2,478
The Vridor rubbish incinerator should never have been placed in a built up area. Smoke from it can often be seen and when we have high pressure, temperature inversion traps the pollution. So much for having ‘free' heat!

I see a lot of works equipment in a compound on the south side of Callaghan Square. Wonder if that has anything to do with the now funded Metro link between the Bay Line and the south side of Central station? Anyone know what route this link will take?
 

sefyllian

Member
Joined
14 Jan 2013
Messages
97
Anyone know what route this link will take?
The TfW consultation on potential extensions to Newport Road had a map giving a rough idea of the route.
 

Attachments

  • e61a6e1f89aa9e441571250351888f4c_Tram-train_via_freight_alignment_FINAL.jpg
    e61a6e1f89aa9e441571250351888f4c_Tram-train_via_freight_alignment_FINAL.jpg
    428 KB · Views: 133

Tomos y Tanc

Member
Joined
1 Jul 2019
Messages
646
- Gabalfa station is almost certainly happening but I'm not sure exactly where it'll be yet
It's not actually in what most Cardiffians would refer to as Gabalfa. It's in Mynachdy between Mynachdy Road and the railway.

TBF Mynachdy in in the Gabalfa ward while, confusingly, the Gabalfa council estate isn't! It's another example on the ever shifting boundaries of Cardiff suburbs. Let's not get started on where Canton is or isn't!
 

Last Hurrah

Member
Joined
17 Jan 2023
Messages
67
Location
Canton
Plenty of progress made alongside Canton Depot

Security fencing installed to separate Depot sidings from adjacent City Line tracks

Plenty of masts in place for the sidings, with wiring seemingly well advanced for this short stretch of Electrification
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
2,478
I thought that when they double tracked the City Line curve south of the Canton depot that all would be well. Apparently this not the case as the City Line will continue to be limited to one train every 30 minutes - which is appalling for an urban railway serving densely populated west Cardiff plus having trains from the valleys. It means that full benefit of all the money spent electrifying the system via Radyr is not being realised. As this area is under Network Rail - they should get on and sort out this bottleneck as a top priority.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
450
I thought that when they double tracked the City Line curve south of the Canton depot that all would be well. Apparently this not the case as the City Line will continue to be limited to one train every 30 minutes - which is appalling for an urban railway serving densely populated west Cardiff plus having trains from the valleys. It means that full benefit of all the money spent electrifying the system via Radyr is not being realised. As this area is under Network Rail - they should get on and sort out this bottleneck as a top priority.
The last service diagram I saw said that the City Line service would be trains looping through the city in both directions - so Pontypridd-Radyr-Queen St-Central-Fairwater-Radyr-Pontypridd and vice versa, every 30 minutes in each direction. I suspect that part of the reason the service isn't being enhanced further is lack of capacity elsewhere (e.g. at Central and Queen St).

I do strongly suspect that the City Line will eventually be served by additional services running onto the newly-funded tramway between Central and the Bay (via a ramp down from the mainline embankment into the existing car park) as this avoids the need to find additional platform capacity on the main line at Central. So the City Line stations would have 2tph via Central and Queen St and perhaps 4 tph to Central (EDIT - this'd be Central's new low-level tramway platforms) and the Bay. But that's purely speculation on my part.
 
Joined
13 Feb 2011
Messages
1,063
Location
Cardiff
My Image below shows groundwork for the Metro track by the WMC with the new Premier Inn on the left.

Is that definitely Metro related work?

The area by the WMC was annouced as an extension only a few weeks ago. Has a route been agreed and planning permission secured etc? This all seems to be happening very quickly if so. Is it not unconnected road/highway works?
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
2,478
Is that definitely Metro related work?

The area by the WMC was annouced as an extension only a few weeks ago. Has a route been agreed and planning permission secured etc? This all seems to be happening very quickly if so. Is it not unconnected road/highway works?
MikePJ in post 333 above suggests that I was incorrect in suggesting that it is Metro work and that it was to insert an underground heating system for the WMC and proposed Arena using waste heat from the nearby rubbish incinerator. Goodness knows if it is Metro related?
 

mrmartin

Member
Joined
17 Dec 2012
Messages
1,016
Is this underground utility work not going to have to be diverted for the metro? What a waste :(
 