Batley Lad
Member
- Joined
- 9 May 2019
- Messages
- 69
I forgot about the existing footbridge at Dewsbury station and the need to make the current passing loop redundant.
As I posted before, this section from Dewsbury to Morley new station has no plans in the public domain.
With two stations in need of modification and/or modernisation, two viaducts and a lengthy tunnel to deal with.
I would have thought that some detail would have been in the public domain for this section.
The only detail I can take from our joints posts, is that this section of the route will require some lengthy blockades to provide the platform and line changes at Dewsbury and further works on viaducts and Morley tunnel.
Re Batley
The new footbridge shown within the video is in the location I remember from the road show events I attended.
As I posted before, this section from Dewsbury to Morley new station has no plans in the public domain.
With two stations in need of modification and/or modernisation, two viaducts and a lengthy tunnel to deal with.
I would have thought that some detail would have been in the public domain for this section.
The only detail I can take from our joints posts, is that this section of the route will require some lengthy blockades to provide the platform and line changes at Dewsbury and further works on viaducts and Morley tunnel.
Re Batley
The new footbridge shown within the video is in the location I remember from the road show events I attended.