7.2.19 Existing destinations of freight traffic heading eastbound along the Hope
Valley route include:
Via Sheffield- Dewsbury, Scunthorpe, West Burton, Drax, Leeds,
Selby Potter Group, Eggborough, Attercliffe and Ferrybridge; and,
Via Chesterfield- Bow East, Ripple Lane, Barrow Hill, Washwood
Heath, Elstow, Walsall, Harlow Mill, Ely, Ratcliffe, Wellingborough,
West Thurrock, Theale and Brentford180.
7.2.20 [part snipped] ... This traffic predominantly runs to and from 2 locations south of the line:
quarries along the Peak Forest/Buxton route, linked to the Hope Valley
line at Chinley East Junction; and, Hope Cement Works, linked to the
Hope Valley line at Earles’ Siding. At Dore West Junction approximately
two thirds of the freight services go via Dore South Curve, towards
Chesterfield and beyond. The remaining freight services, and all
passenger services, continue through Dore & Totley Station towards
Sheffield.