Remaining EMR HST Diagrams

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HST274

Member
Joined
3 Mar 2020
Messages
710
Location
Worcestershire
No HSTs 1st-3rd, there should be sets out on the 8th and 9th but the diagrams haven't been finalised.
That makes sense. Any idea when these diagrams might be confirmed?


Edit: Supposedly the following are pathed as HSTs.
https://www.realtimetrains.co.uk/train/Y80868/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99426/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99439/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99456/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99560/2021-05-09/detailed

Excluding the last one these are only the HST's that will supposedly leave Sheffield. I could see none from Leeds but didn't do an in depth look.
 
Last edited:

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,443
Location
York
That makes sense. Any idea when these diagrams might be confirmed?
That makes sense. Any idea when these diagrams might be confirmed?

That makes sense. Any idea when these diagrams might be confirmed?

Edit: Supposedly the following are pathed as HSTs.
https://www.realtimetrains.co.uk/train/Y80868/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99426/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99439/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99456/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99560/2021-05-09/detailed

Excluding the last one these are only the HST's that will supposedly leave Sheffield. I could see none from Leeds but didn't do an in depth look.
Take note of ECS moves from Neville Hill. For some reason they’re starting from Shef in 2 and a half weeks time. Will send RTT link below:
 

HST274

Member
Joined
3 Mar 2020
Messages
710
Location
Worcestershire
Take note of ECS moves from Neville Hill. For some reason they’re starting from Shef in 2 and a half weeks time. Will send RTT link below:
Will do. I might look at catching one of these trains and will use this to make sure they are running. Thanks.
 

BRX

Established Member
Joined
20 Oct 2008
Messages
3,640
So is the expectation that at least one or two HSTs will continue until 31st May - or is there a danger of them finishing before then?

Trying to work out my strategy for a final trip on a scheduled unmodified HST.
 

43 302

Established Member
Joined
25 Oct 2019
Messages
1,624
Location
London
So is the expectation that at least one or two HSTs will continue until 31st May - or is there a danger of them finishing before then?

Trying to work out my strategy for a final trip on a scheduled unmodified HST.
I would say that, at the moment, the last day that will definitely have booked HSTs will be at 14th.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,449
So is the expectation that at least one or two HSTs will continue until 31st May - or is there a danger of them finishing before then?

Trying to work out my strategy for a final trip on a scheduled unmodified HST.
In addition to what @43 302 has just posted I made a search of RTT a few days ago.

There are no booked EM moves showing at all, either on or off Neville Hill, beyond Saturday 15th, which makes it highly likely any further HST use will be on an unplanned basis.
 
Last edited:

43 302

Established Member
Joined
25 Oct 2019
Messages
1,624
Location
London
In addition to what @43 302 has just posted I made a search of RTT a few days ago.

There are no booked EM moves showing at all, either on or off Neville Hill, beyond Saturday 14th, which makes it highly likely any further HST use will be on an unplanned basis.
The 14th is the Friday.
 

43 302

Established Member
Joined
25 Oct 2019
Messages
1,624
Location
London
Although the 15th is the last day of the timetable it is quite likely that there won't be any sets out. Similar how the last VP service was on a Friday to reduce the number of enthusiasts.
 

island

Veteran Member
Joined
30 Dec 2010
Messages
16,132
Location
0036
Yeah, as far as I know there are no HST diagrams on Saturdays anyway.
 

BRX

Established Member
Joined
20 Oct 2008
Messages
3,640
Thanks. I should try and do it in the next couple of weeks then really.
 

WesternLancer

Established Member
Joined
12 Apr 2019
Messages
7,208

43074

Established Member
Joined
10 Oct 2012
Messages
2,017
That makes sense. Any idea when these diagrams might be confirmed?


Edit: Supposedly the following are pathed as HSTs.
https://www.realtimetrains.co.uk/train/Y80868/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99426/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99439/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99456/2021-05-09/detailed
https://www.realtimetrains.co.uk/train/C99560/2021-05-09/detailed

Excluding the last one these are only the HST's that will supposedly leave Sheffield. I could see none from Leeds but didn't do an in depth look.
What they are pathed as bears no resemblance to whether or not they will be HSTs on the day these days, best option as others have said is to look for trains to/from Neville Hill Depot in the first instance and work from there, and if there are none then it is safe to assume no HST diagrams are running.
 

WesternLancer

Established Member
Joined
12 Apr 2019
Messages
7,208
What they are pathed as bears no resemblance to whether or not they will be HSTs on the day these days, best option as others have said is to look for trains to/from Neville Hill Depot in the first instance and work from there, and if there are none then it is safe to assume no HST diagrams are running.
But note there are East Mids Rly ECS workings from Neville Hill Depot to Sheffield via Leeds platform 8 on that day as per example below. I guess assumption is these are HSTs though I wonder why they are running ECS that day? Someone may be able to explain.

 

43055

Established Member
Joined
8 Mar 2018
Messages
2,905
But note there are East Mids Rly ECS workings from Neville Hill Depot to Sheffield via Leeds platform 8 on that day as per example below. I guess assumption is these are HSTs though I wonder why they are running ECS that day? Someone may be able to explain.

The only explanation that I can think of is if LNER are not running into Kings Cross but that doesn't seem to be the case.
 

Mainline421

Member
Joined
7 May 2013
Messages
506
Location
Aberystwyth
Although the 15th is the last day of the timetable it is quite likely that there won't be any sets out. Similar how the last VP service was on a Friday to reduce the number of enthusiasts.
Seems unlikely EMR would end the service to Alfreton and Langley Mill early just to discourage enthusiats.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Are the HSTs short formed as I saw one yesterday on the Southern section of the Midland Mainline with only 6 coaches, I thought they were 7/8 coaches?

And that it was the former GC HST sets that were 6 coaches long?
 

43 302

Established Member
Joined
25 Oct 2019
Messages
1,624
Location
London
Are the HSTs short formed as I saw one yesterday on the Southern section of the Midland Mainline with only 6 coaches, I thought they were 7/8 coaches?

And that it was the former GC HST sets that were 6 coaches long?
None of them are short formed. All three sets are formed up 2+6.
 

WesternLancer

Established Member
Joined
12 Apr 2019
Messages
7,208
Are the HSTs short formed as I saw one yesterday on the Southern section of the Midland Mainline with only 6 coaches, I thought they were 7/8 coaches?

And that it was the former GC HST sets that were 6 coaches long?
They permanently 'removed' as it were, 1 first and 1 standard class carriage from the remaining sets in IIRC, about December 2020.

I assumed a belated attempt to scale back the costs that were being spent on bringing the ex LNER carriages back up to standard and a recognition of the reduced numbers of people travelling due to Covid meant they could be done without.

Not really clear to me why the 1st class seats in the buffet car need to be reserved for staff use (given there is a closed up buffet space for staff to use if needed), though I doubt the demand for those seats is required on most days.
 

221129

Established Member
Joined
21 Mar 2011
Messages
6,520
Location
Sunny Scotland
given there is a closed up buffet space for staff to use if needed
Because it is unreasonable to expect staff needing to travel passenger to spend the journey from London to Nottingham stood in a closed buffet? I know if my TOC tried that then they'd have a cancelled return working.
 

WesternLancer

Established Member
Joined
12 Apr 2019
Messages
7,208
Because it is unreasonable to expect staff needing to travel passenger to spend the journey from London to Nottingham stood in a closed buffet? I know if my TOC tried that then they'd have a cancelled return working.
I see. What space do staff in those circs on other services use - eg longer distance services like 158 run Liverpool - Norwich (or legs of). Do all services have reserved staff seating areas?
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
They permanently 'removed' as it were, 1 first and 1 standard class carriage from the remaining sets in IIRC, about December 2020.

I assumed a belated attempt to scale back the costs that were being spent on bringing the ex LNER carriages back up to standard and a recognition of the reduced numbers of people travelling due to Covid meant they could be done without.

Not really clear to me why the 1st class seats in the buffet car need to be reserved for staff use (given there is a closed up buffet space for staff to use if needed), though I doubt the demand for those seats is required on most days.
Ahh thanks, I hadn't really noticed the HSTs were operating with a shorter formation - I thought they were still running around as 2+7/2+8.
 