Bertie the bus
Established Member
- Joined
- 15 Aug 2014
- Messages
- 2,981
Are you sure about that? According to Network Rail they charge charter operators 21.764 pence per kWh for electric traction. I’m assuming this 3,700 kW quoted for the 90s is relevant so 3700 * 5 (hours of the return trip) * 21.764p is about £4K.The TAB (Track Access Billing) between Euston and Picc on electric traction is now around £14,000 a pop - that is a lower end estimate, and that is before anything else.