LNW-GW Joint
Veteran Member
The 800/801 series (IEP), on which the entire 80x production was based, was specified and procured by the government-owned DfT, and then passed on to GWR and LNER with almost no scope for change beyond paintwork and a few internals.Exactly. Pretty sure people that travel daily to and from Paddington to the West don't say they've 'been on an Azuma'. And why, when we're (hopefully) going for a united identity for our 'Great British' railway, would we stick with a Japanese word? It's a stupid name for a stupid train and to me, has always stood for cheap and nasty, poorly made rubbish.
Your stupid, cheap and poorly made train is down to the DfT (with the 802s having a little FirstGroup variation).
What makes you think GBR train procurement will be any different, seeing as they will be working to DfT rules?
The politics said we needed a second UK-based train manufacturer to keep Bombardier honest, hence the Hitachi factory in Newton Aycliffe.
That sort of politics is still there (see the HS2 rolling stock procurement), only now there's CAF and Siemens with UK sites to keep busy too.