Moderator note: Split from https://www.railforums.co.uk/threads/nuneham-viaduct-shut-didcot-oxford.246310/
The ideal solution, in view of discussions in other threads, but taking a few years, would be to build a new 2-track bridge alongside, divert the railway on to it, demolish the old bridge, build a new 2-track bridge in its place, and widen the railway to 4 tracks.
The ideal solution, in view of discussions in other threads, but taking a few years, would be to build a new 2-track bridge alongside, divert the railway on to it, demolish the old bridge, build a new 2-track bridge in its place, and widen the railway to 4 tracks.
Last edited by a moderator: