• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

EMR diagrams

Status
Not open for further replies.

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
A Class 170 operates the 17:42 Derby to Crewe via stoke on trent.
Interesting. Normally the unit for the 1742 comes off a Liverpool at Nottingham before coming over to Derby.

153's now added as they continue to work the Barton on Humber service for northern and it looks like they may work in service to Nottingham in the evening (with a PRM compliant unit) to allow them to be swapped round.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Trainfan2019

Member
Joined
9 Aug 2019
Messages
452
Not sure if this is a regular planned allocation but the 17:07 from Crewe to Derby has been a 170 most weekday evenings in recent weeks.
 

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
Ah thanks. Don't know how I missed that one! In an ideal world it would be nice to have class 170s first choice allocated followed by class 158s as substitutions.
Yes that would be ideal but once the 153's and 156's are gone that would be the case.

The HST's this week seem to be diagramed to be out all day on the xx34 from London and xx45 from Nottingham just like before the December timetable change. This will probably change the 180 diagrams as well.
 

43074

Established Member
Joined
10 Oct 2012
Messages
2,017
Yes that would be ideal but once the 153's and 156's are gone that would be the case.

The HST's this week seem to be diagramed to be out all day on the xx34 from London and xx45 from Nottingham just like before the December timetable change. This will probably change the 180 diagrams as well.
That is to provide more capacity for this week only whilst Kings Cross is closed.
 

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
Now added 170 Sunday diagrams which includes 2 trips to Matlock.
 

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
HST Update -

2 diagrams in the morning from Leeds to London.
2 diagrams at night from London to Leeds.
HST diagrams updated for weekday and Saturdays.

Update 24/01/20 - A 180 Saturday diagram added. Thanks to @Cundy66 for the info.
 
Last edited:

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
Update 25/02/21 - Updated 180's as currently only 1 set out on weekdays and updated weekends on the HST's.
 

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
Two 180s started the day yesterday but one failed mid morning.
Ah ok. It's just that every day the 1705 London - Notts seems to be 5 vice 10 while the 1634 is 10 vice 5 on the train updates on the website at the moment.
`
Living up to their reputation, then!
Even better today as the 1705 from London is 8 vice 10 car which would make is a double 4 car 222 so no 180's out.
 

OTRail

Member
Joined
14 Jul 2019
Messages
529
Ah ok. It's just that every day the 1705 London - Notts seems to be 5 vice 10 while the 1634 is 10 vice 5 on the train updates on the website at the moment.

Even better today as the 1705 from London is 8 vice 10 car which would make is a double 4 car 222 so no 180's out.
I’m surprised - I travelled on one of EMR’s 180s the other week from Leicester to STP and it was a smooth journey with no faults and delays. Must’ve caught that 180 on a good day...
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
I’m surprised - I travelled on one of EMR’s 180s the other week from Leicester to STP and it was a smooth journey with no faults and delays. Must’ve caught that 180 on a good day...

They are decent enough to travel on when they work - the trouble is that they stop working pretty regularly!
 

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
Two HSTs out today including 43102. Possibly due to the works over at Kings Cross.
43251 + NL57 + 43320
0737 Sheffield to London via Notts
1834 London to Sheffield via Notts

43102 + NL58 + 43238
0834 Sheffield to London via Notts
2002 London to Sheffield
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,434
Location
York
Is the STP-STP via Oakham ECS going all the way until the timetable change?
 

sfbasher

Member
Joined
18 Aug 2013
Messages
11
Morning all.

The weekday 1B16 0711 Nottingham to St Pancras International - can I now assume this is a 7 car Meridian, and not an HST?

Thanks for your assistance.
 

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
Is the STP-STP via Oakham ECS going all the way until the timetable change?
Would think so. After the timetable change it is basically replaced by a passenger service from London to Melton and return.
Morning all.

The weekday 1B16 0711 Nottingham to St Pancras International - can I now assume this is a 7 car Meridian, and not an HST?

Thanks for your assistance.
It is a 222. Probably more likely to be a 5 car than 7 car as it forms the 0931 to Sheffield which is normally a 5 car 222.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,439
Is the STP-STP via Oakham ECS going all the way until the timetable change?
If I’ve got the right train RTT says yes the path exists throughout the timetable period, 5M17 on weekdays but not Wednesday. But it is also a Q path (runs as required).
 

SteveyBee131

Member
Joined
28 Oct 2017
Messages
651
Location
Grimsby Town
I'm not entirely sure where to put this so please forgive me/move it elsewhere if it's the wrong place or already covered...

From the above can I deduce that EMR will have for the May timetable?

5 x 3 car 170
7 x 2 car 170
26 x 2 car 158
24 x 2 car 156 (how many/when do some leave for Northern?)
Possible some 153's unless they are all off lease by then?

Updates/correctionns welcome!
From what I can work out by trawling through what's been uploaded to the open data feeds (as viewed via Real Time Trains), I would guess that from the May Timetable 47 units are required for EMR's regional services on weekdays (assuming none are diagramed for a pair all day).

28 of those go on routes other than Liverpool-Nottingham/Norwich which has already been established elsewhere shall most likely remain 158 worked.

Currently, assuming this expected fleet is still something like reality, 12 x 170, plus 7 x 158 (allowing a full complement of 19 for LIV-NRW), also allowing for 3 units maintenance cover, at least 12 156s will need to stay with EMR
 

Impey0711

On Moderation
Joined
16 Sep 2013
Messages
281
Anyone know good Fridays allocations as of yet the 16:20 stp - lei the service in question??
 

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
Anyone know good Fridays allocations as of yet the 16:20 stp - lei the service in question??
Looking at RTT and the platform numbers your train is working:
0649 Sheffield to London
1121 London to Nottingham
1345 Nottingham to London
1620 London to Nottingham.....

It looks like the 1111 London to Sheffield goes off the same platform as the 1121 so I would assume it will either be a 4 or 5 car 222 which has come in as a double set. I would doubt it be a 180 as they have only been up to Sheffield once so far as far as I can tell.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
7,605
Looking at RTT and the platform numbers your train is working:
0649 Sheffield to London
1121 London to Nottingham
1345 Nottingham to London
1620 London to Nottingham.....

It looks like the 1111 London to Sheffield goes off the same platform as the 1121 so I would assume it will either be a 4 or 5 car 222 which has come in as a double set. I would doubt it be a 180 as they have only been up to Sheffield once so far as far as I can tell.

It is allocated 222002.
 

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
Over the next week or so the diagrams on the first post will be updated for the new timetable once known. For now I have stated to go thought RTT for the class 360 workings.
 

SteveyBee131

Member
Joined
28 Oct 2017
Messages
651
Location
Grimsby Town
Over the next week or so the diagrams on the first post will be updated for the new timetable once known. For now I have stated to go thought RTT for the class 360 workings.
I've been trying to go through RTT to work out Regional DMU diagrams. It's fairly straightforward until a unit goes on depot. Some are just briefly to get out of the way, and the return is the same headcode, not always though, and that's where the guesswork starts!

And there's one or two workings with no corresponding return, or returns with no corresponding outward trip! So guessing what they join with to get there. Again it's usually straightforward.

It will be interesting to find out how close to the actual results my guesses were!

I would offer to share what I've got so far, but my technical skills are somewhat limited! :oops::lol:
 

43055

Established Member
Joined
8 Mar 2018
Messages
2,903
I've been trying to go through RTT to work out Regional DMU diagrams. It's fairly straightforward until a unit goes on depot. Some are just briefly to get out of the way, and the return is the same headcode, not always though, and that's where the guesswork starts!

And there's one or two workings with no corresponding return, or returns with no corresponding outward trip! So guessing what they join with to get there. Again it's usually straightforward.

It will be interesting to find out how close to the actual results my guesses were!

I would offer to share what I've got so far, but my technical skills are somewhat limited! :oops::lol:
Hopefully I can start populating the Intercity and Regional diagrams next week. Started on the 360's first as they are easy to work out :lol: .

The 153's will continue on the Barton branch and most likely Skegness strengthening (will have to join with a PRM compliant unit to get to and from Nottingham) and the 170's will appear on more routes.
 
Status
Not open for further replies.

Top