DanNCL
Established Member
It's not operational on the ECML, but the 80xs are all fitted with it. On the LNER, TPE and Hull Trains 80xs there is no traditional speedometer so ETCS has to be functioning correctly to display the speedometer on the screen, even though the route itself is not ETCS equipped, otherwise the train has to be declared a failure. The GWR units don't have the same issue as they have a seperate speedometer for the Great Western ATP system.Do you mean ETCS? If so, I didn’t think ETCS was installed/operational on the ECML yet. Does anyone know when it will be installed?