Search results

  1. T

    Manchester - Liverpool Electrification

    As the work is coming to an end I would like to thank you all for your comments and pictures. I would also like to say what a pleasure it has been working in the area. On a whole the public have been great (apart from the shotgun incident that happened) I only have a few more weeks on the...
  2. T

    Manchester - Liverpool Electrification

    I will be installing 2 foundation at Roby next Saturday just off the platform. It will be quite late (02:00 Sunday) of anyone was keen to see how it's done then the platform would provide good viewing.
  3. T

    Manchester - Liverpool Electrification

    FYI I am at Roby as I write this message supervising two trial holes cornfield final SSA structures thatveill be located 5m from the face of station road bridge. The two SSA's are being installed to bring the wire in through the bridge. They will be installed within the next 2 weeks or so...
  4. T

    Manchester - Liverpool Electrification

    Last portal should be up on sankey by 14th January
  5. T

    Manchester - Liverpool Electrification

    Hi everyone, If anyone is interested in the foundation work to sankey viaduct I have a document that myself and the project engineer for the viaduct have compiled. The document contains pictures and discriptions of the various stages during the construction. To receive the file just give me...
  6. T

    Manchester - Liverpool Electrification

    On the 27th December a small team will be entering Sankey Viaduct and carrying out brick repair works. Access will be made by digging down through the ballast to expose the access covers. --- old post above --- --- new post below --- The 26th I mean.
  7. T

    Manchester - Liverpool Electrification

    The pour has already been done.
  8. T

    Manchester - Liverpool Electrification

    What kind of pictures do you guys want?
  9. T

    Manchester - Liverpool Electrification

    As far as motorway bridges go there are 2 between Huyton and Bryn. 1 is the M57 at 0m 75ch and the other being the M6 just before Bryn. The M57 has had 16 stud bolts installed for the steel and the M6 has had 32 installed.
  10. T

    Manchester - Liverpool Electrification

    I installed the stud bolts on the M57.
  11. T

    Manchester - Liverpool Electrification

    Foundation works to Sankey will be carried out tonight using RRV's. They will then have to wait until next Saturday when possessions resume on the DSE lines .
  12. T

    Manchester - Liverpool Electrification

    Foundation works on Carr Mill will be commencing this coming week. --- old post above --- --- new post below --- M57 motorway will have road closures in place tommorow evening whilst works are carried out also.
  13. T

    Manchester - Liverpool Electrification

    Works will take around 4 months to complete.
  14. T

    Manchester - Liverpool Electrification

    Scaffolding works for Sankey and Carr Mill started yesterday.
  15. T

    Track jobs

    I am using a company called Jamsgroup.
  16. T

    Track jobs

    What do you mean toc?
  17. T

    Track jobs

    Hi, I am starting a PTS & Track induction course on 12/08. I have a couple of mates who have done this and seem as though they've landed on their feet and got some good work out of it. What I want to know is apart from the pts and tic are there any other tickets I should go for at such...
  18. T

    Track Induction training

    Hi, I'm looking to do my pts and track induction course. I am using a company called Jamsgroup anyone used them before?